The operation of our website www.discomp.cz we use so-called cookies. Cookies are files used to customize site content to measure its performance and generally to ensure your maximum satisfaction. By using this site, you agree with the way the cookie treat.

OK
true

TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station

We are sorry, this product is no longer in our offer.

TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
×
0/0
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
TP-Link WBS510 - Outdoor 5GHz 300Mbps Wireless Base Station
 
Manufacturer

TP-Link

Code10120113
Part No.WBS510
  • Related products2
Masterlan patch cable UTP, Cat5e, 1m, yellow
PCU5E-1YW-MS
 
0.62 EUR excl. VAT
0.75 EUR incl. VAT
In Stock
Masterlan comfort patch cable UTP, Cat5e, 5m, gray
PCU5E-5-MSC
 
3.71 EUR excl. VAT
4.49 EUR incl. VAT
In Stock
Parameters
GPSR

Product description

TP-LINK’s 5GHz 300Mbps Outdoor Wireless Base Station is specifically designed to provide an effective solution for outdoor wireless networking applications. With its centralized management platform and high degree of flexibility, it is the ideal choice for providing point-to-point, point-to-multipoint, and outdoor Wi-Fi coverage. The TP-LINK Outdoor Wireless Base Station pairs professional performance with user-friendly design, making it the perfect solution for both business and home users.

WBS510

Long-Distance Wireless Data Transmission

Two external RP-SMA antenna interfaces allow the Outdoor Wireless Base Station to integrate seamlessly with TP-LINK's line of sector and dish antennas. Where long- distance wireless data transmission is necessary, the WBS510 can be paired with a TP-LINK dish antenna, allowing it to transfer data over distances of up to 50 km.

Easy Installation, No Tools Needed

Pharos Base Stations works seamlessly with TP-LINK dish and sector antennas to provide efficient PtP and PtMP data transmission. Pharos Base Stations also feature a built-in mount, meaning that no tools are required for installation.

quick and easy installation

Enterprise Level Hardware Design

To maximize performance and stabilize long distance wireless transmission, the Pharos Series is built with Qualcomm Atheros enterprise level chipsets, high gain-antennas, and high-power amplifiers. In addition to excellent internal components, Pharos Series Base Stations also feature specially designed, weatherproof enclosures and PoE capability. This industry-leading hardware ensures that Pharos Series Base Stations can be deployed in a wide variety of environments, withstanding broad ranges of humidity and temperature (-30°C~70°C) (-22°F~158°F).

MAXtream TDMA Technology – Guaranteed Throughput

As networks grow in scale, base stations and other devices often compete for access to a single data connection, resulting in diminished throughput and a poorer experience for the end-user. Pharos Base Stations utilize MAXtream TDMA Technology to counteract this competition and ensure that data transfer rates remain high, even as demand increases.

Pharos Control - Centralized Management System

Pharos Base Stations are equipped with Pharos Control, a centralized management software that helps users easily manage all network devices from a single PC. Pharos Control provides ultimate convenience for users who wish to control device discovery, monitor network status, upgrade device firmware, or perform other network maintenance tasks.

PharOS

PharOS is a user-friendly, web-based management system that allows advanced users and network professionals to perform fine-tune calibration and access more advanced configuration options.

Key features

  • Broad operating frequency channels ensure less wireless interference
  • Wireless N speed up to 300Mbps
  • Selectable bandwidth of 5/10/20/40MHz
  • Adjustable transmission power from 0 to 27dBm/500mW
  • 2 RP-SMA connectors for external MIMO antenna
  • Work with TP-LINK dish antenna for long-distance wireless data transfer up to 50+Km
  • 1 10/100Mbps Ethernet port for passive PoE and 1 10/100Mbps Ethernet port for extended applications
  • TP-LINK Pharos MAXtream (Time-Division-Multiple-Access) technology improves product throughput, capacity and latency performance, ideal for PtMP applications
  • Centralized Management System – Pharos Control
  • Supports AP Router, AP Client Router, AP, AP Client, Multi-Bridge and Repeater Operation modes
  • Weatherproof enclosure, 15kV ESD and 6KV lightning protection

GPSR

Contact:
TP-LINK Czech s.r.o.
Pekařská 695/10, 155 00 Praha 5
support.cz@tp-link.com

Bussines information

Luděk Merta, +420 722 926 224 , ludek.merta@discomp.cz

Technical parameters

Wireless features

Wireless frequency: 5 GHz
WiFi standards: 802.11n, 802.11a
Transmission speed - 5GHz [Mb/s]: 300
Tx power 5GHz [dBm]: 27
Security: 64/128/152-bit WEP / WPA / WPA2,WPA-PSK / WPA2-PSK
5GHz MIMO: 2 x 2
Type of antenna: Detachable
Detachable antennas: 2

Connectors and Interfaces

RF connectors: (2) RSMA female
LAN speed: (2) 10/100Mbps

Power

Power over Ethernet: 16 .. 27V DC
PoE type: PoE-In (only)

Physical characteristics

Purpose: Outdoor
Buttons: Reset
Operating temperature [°C]: -30 up to 70
Width [mm]: 75
Height [mm]: 198
Depth [mm]: 40

Hardware

CPU: MIPS 74Kc
CPU frequency [MHz]: 560
RAM [MB]: 64

Software

Operating mode: Bridge, Client, Repeater, AP Router, Access Point, Client Router (wisp)
Default IP address: 192.168.0.254
Default login and password: admin / admin
 
Huawei eKit
Huwei eKit
×

Login

Name

Do not have an account?
Register and get:

Better prices

Overview of your orders

Possibility to obtain credit

Validation guarantees by SN

Faster order processing

Registration
×

Report an error

Your e-mail:
Type text from the image:
×

Have a question?

Your e-mail:
Type text from the image: